With close to 40 years of industry leadership, PETRONAS continues to go Above and Beyond to provide a reliable supply of Liquefied Natural Gas (LNG) around the world.
This is enabled through PETRONAS’ focus on customer-centricity and flexibility which have supported new adopters of LNG with tailored solutions, ensuring that the benefits of this cleaner energy can be felt by businesses of all sizes.
To date, PETRONAS has delivered over 12,000 LNG cargoes safely across the world from our portfolio of global LNG assets. The bedrock of our operations, the PETRONAS LNG Complex in Bintulu, Sarawak, is one of the world’s largest LNG facilities in a single location. We are also the world’s first owner and operator of two floating LNG facilities, PFLNG Satu and PFLNG Dua that enables us to unlock marginal and stranded gas fields.
Speak to us to discover how PETRONAS can go Above and Beyond for your business.
PETRONAS LNG Complex, Bintulu, Sarawak
Quick Facts:
- 9 production trains
- 29.3 million tonnes per annum (MTPA)
- More than 400 BCe delivered annually
PETRONAS Floating LNG SATU and DUA
- 365 metres long (75th floor of PETRONAS Twin Towers), as long as 3 soccer fields
- Design life of 20 years
- Operating in waters 200 metre-deep
- 1.2 million tonnes per annum (MTPA) of LNG
- Achieved first gas on 14 November 2016
- Achieved first LNG drop on 5 December 2016
- Achieved first LNG cargo on 1 April 2017
- Successfully relocated to Kebabangan Gas Field, 90KM offshore Kota Kinabalu, Sabah, Malaysia
- Achieved 50 LNG cargoes as of 5 October 2021
- 393 meters long (80th floor of PETRONAS Twin Towers)
- Design life of 20 years
- Operating in waters 1300 – 1500 metre-deep
- 1.5 million tonnes per annum (MTPA) of LNG
- Officially named by Prime Minister of Malaysia on 27 November 2019
- Moored at the Rotan Gas Field, 140KM offshore Kota Kinabalu, Sabah, Malaysia
- Achieved first gas on 6 February 2021
- Achieved first LNG drop on 15 February 2021
- Produced first LNG cargo on 24 March 2021
Gladstone LNG, Australia (GLNG)
Quick Facts:
- Australia – Coal Seam Gas (CSG)
- Integrated CSG to LNG project
- GLNG Equity Distribution: Santos – 30%; PETRONAS – 27.5%; Total – 27.5%; KOGAS – 15%
- More than 5 Tcf of natural gas resource
- Active drilling programme of greater than 300 wells per year
- Capital investments USD31.9 billion
- Operating Expenditure USD15.9 billion
- 7.8 million tonnes per annum (MTPA) with each train carrying 3.9 MTPA
- 420 km underground 42” Gas Transportation Pipeline (GTP)
Egypt LNG, East of Alexandria
Quick Facts:
- Two flares at maximum height of 55 metres
- Two storage tanks at 140,000m3 capacity each
- 2 trains with 3.6 MTPA capacity each
- 2.2 billion standard cubic feet of gas processed per day
- Longest marine jetty in the region (2.4KM)
- First cargo delivered in 2005
- Delivered 716 LNG cargoes in 13 years (2005 and 2018)
Level 79 Tower 2,
Kuala Lumpur City Centre
50088 Kuala Lumpur, Malaysia
General Line: +60320515000
Email: lngenquiry@petronas.com
17F Nisseki Yokohama Building
1-1-8 Sakuragi-cho, Naka-ku, Yokohama
Kanagawa 231-0062, Japan
General Line: +81452289350
Name: Ezhar Yazid Jaafar
Email: ezhar@petronas.com
(Guangzhou Representative Office)
Room 1709, Pearl River Tower
No. 15 Zhujiang West Road, Zhujiang New Town
Tianhe District, Guangzhou 510623, China
Name: David Tung
Email: tung_jenloong@petronas.com