Total technology solution for prediction, removal, and prevention of chloride-induced corrosion (TC5)

2020 Success Stories - 26 Oct

Pain Points:

Chloride corrosion in chemical/petrochemical industries (carbon steel, stainless steel, aluminum) leads to cracking from contaminant accumulation, exacerbated by temperature/concentration, causing pitting and stress cracking.

Requirements:

Need a robust solution for early detection, real-time monitoring, nondestructive assessment, material-specific approaches, preventative measures, and accurate life cycle prediction.

Winner:

No Winning Solution: No winning technology or method was identified for this challenge.

 


Tech Challenge

Left footer graphic with PETRONAS Dots Right footer graphic with PETRONAS Dots